Conference paper
Effect of HCI degradation on the variability of MOSFETS
C. Zhou, Keith A. Jenkins, et al.
IRPS 2018
Enterprise server processor designs, which operate at extreme high frequencies and power envelopes, depend critically on power supply noise mitigation techniques. With supply voltage scaling, very high current draws, and broad usage of clock gating, advanced solutions are needed for next-generation products to minimize droop mitigation response time, which can be defined as the latency from when a dangerous droop begins until a countermeasure is effective.
C. Zhou, Keith A. Jenkins, et al.
IRPS 2018
James Warnock, Y.-H. Chan, et al.
ISSCC 2011
Shubham Jain, Swagath Venkataramani, et al.
DAC 2018
Christian Menoifi, Matthias Braendli, et al.
ISSCC 2018