Juhnyoung Lee, Ho Soo Lee, et al.
ICEIS 2001
Planners in the steel industry design a set of steel slabs to satisfy the order book subject to constraints on (1) achieving a total designed weight for each order using multiples of an order-specific production size range, (2) minimum and maximum sizes for each slab, and (3) feasible assignments of multiple orders to the same slab. We developed a heuristic solution based on matchings and bin packing that a large steel plant uses daily in mill operations.
Juhnyoung Lee, Ho Soo Lee, et al.
ICEIS 2001
Pavithra Harsha, Ashish Jagmohan, et al.
NeurIPS 2021
Liangzhao Zeng, Boualem Benatallah, et al.
WWW 2003
David C. Parkes, Jayant Kalagnanam, et al.
IJCAI 2001