Thomas M. Cheng
IT Professional
We study the optimal scheduling control of multiclass fluid networks, with constraints on the fluid levels. We present a linear programming-based approach to the general problem, and show that the approach generates the optimal control in a single-station Klimov-like model with side constraints.
Thomas M. Cheng
IT Professional
Liat Ein-Dor, Y. Goldschmidt, et al.
IBM J. Res. Dev
Raymond Wu, Jie Lu
ITA Conference 2007
Michael D. Moffitt
ICCAD 2009