Robert C. Durbeck
IEEE TACON
In this paper, we study polynomial time approximation schemes (PTASes) for the no-wait job shop scheduling problem with the makespan objective function. It is known that the problem is MaxSNP-hard in the case when each job is allowed to have three operations or more. We show that if each job has at most two operations, the problem admits a PTAS if the number of machines is a constant (i.e., not part of the input). If the number of machines is not a constant, we show that the problem is hard to approximate within a factor better than 5/4. © 2005 INFORMS.
Robert C. Durbeck
IEEE TACON
Chi-Leung Wong, Zehra Sura, et al.
I-SPAN 2002
S. Sattanathan, N.C. Narendra, et al.
CONTEXT 2005
Lixi Zhou, Jiaqing Chen, et al.
VLDB