Conference paper
Channel coding considerations for wireless LANs
Daniel J. Costello Jr., Pierre R. Chevillat, et al.
ISIT 1997
We consider the High-Multiplicity Cyclic Job Shop Scheduling Problem. There are two objectives of interest: the cycle time and the flow time. We give several approximation algorithms after showing that a very restricted case is APX-hard. © 2008 Elsevier B.V. All rights reserved.
Daniel J. Costello Jr., Pierre R. Chevillat, et al.
ISIT 1997
Frank R. Libsch, Takatoshi Tsujimura
Active Matrix Liquid Crystal Displays Technology and Applications 1997
Zhihua Xiong, Yixin Xu, et al.
International Journal of Modelling, Identification and Control
L Auslander, E Feig, et al.
Advances in Applied Mathematics