A. Gupta, R. Gross, et al.
SPIE Advances in Semiconductors and Superconductors 1990
We consider the High-Multiplicity Cyclic Job Shop Scheduling Problem. There are two objectives of interest: the cycle time and the flow time. We give several approximation algorithms after showing that a very restricted case is APX-hard. © 2008 Elsevier B.V. All rights reserved.
A. Gupta, R. Gross, et al.
SPIE Advances in Semiconductors and Superconductors 1990
Kafai Lai, Alan E. Rosenbluth, et al.
SPIE Advanced Lithography 2007
A. Grill, B.S. Meyerson, et al.
Proceedings of SPIE 1989
W.F. Cody, H.M. Gladney, et al.
SPIE Medical Imaging 1994