Motion video analysis using planar parallax
Harpreet S. Sawhney
IS&T/SPIE Electronic Imaging 1994
We study the problem of maintaining the 2-edge-, 2-vertex-, and 3-edge-connected components of a dynamic planar graph subject to edge deletions. The 2-edge-connected components can be maintained in a total of O(n log n) time under any sequence of at most O(n) deletions. This gives O(log n) amortized time per deletion. The 2-vertex- and 3-edge-connected components can be maintained in a total of O(n log2 n) time. This gives O(log2 n) amortized time per deletion. The space required by all our data structures is O(n). All our time bounds improve previous bounds.
Harpreet S. Sawhney
IS&T/SPIE Electronic Imaging 1994
David L. Shealy, John A. Hoffnagle
SPIE Optical Engineering + Applications 2007
Heng Cao, Haifeng Xi, et al.
WSC 2003
Jianke Yang, Robin Walters, et al.
ICML 2023