Yingdong Lu
Probab. Eng. Inf. Sci.
We study the capacity problem of matching the supply of re- sources and the demand for resources over a planning horizon of N periods, with the provision that a set of resource capacity decisions must be made before the first period. Our analysis relies on a thorough study of the asymptotic behavior of a random walk with power drift.
Yingdong Lu
Probab. Eng. Inf. Sci.
Yingdong Lu, Siva Theja Maguluri, et al.
ACC 2017
Yingdong Lu, Siva Theja Maguluri, et al.
MAMA/Greenmetrics 2016
Yingdong Lu, Jing-Sheng Song, et al.
Operations Research