Conference paper
Convergence properties of multi-dimensional stack filters
Peter Wendt
Electronic Imaging: Advanced Devices and Systems 1990
The existence of a linear time approximation scheme for makespan minimization was demonstrated in the multiprocessor open shop problem with release dates. The approximation scheme was linear and didn't require solving linear program.
Peter Wendt
Electronic Imaging: Advanced Devices and Systems 1990
S.F. Fan, W.B. Yun, et al.
Proceedings of SPIE 1989
Y.Y. Li, K.S. Leung, et al.
J Combin Optim
Renu Tewari, Richard P. King, et al.
IS&T/SPIE Electronic Imaging 1996